Next up is the rear drop down bed, we already have the track and rollers for it we just need to build the bed frame and I am having a steel frame made for it as well.
This weekend we'll be Formica-ing the tables, installing the existing vent above the kitchen area, and running wires for the rear Rigid Industries Dually LED's that we are going to put back there.
Then it's finish flooring, wall paper the walls, paint the ceiling, and have the cabinets stained.. Upholstery, TV & Mount and it's all done!
I'm thinking about less than 2 months and we'll be completely done